Shower installation: what is involved in fitting a new shower

Installing a shower starts with your water system, not the shower itself. The fitter checks whether you have a combi boiler, a hot water cylinder or a cold tank in the loft, and what pressure you get, because that decides which showers will work well. Then comes the route for the pipes and waste, the waterproofing of the walls, and finally the tray, valve, screen and head.

We install showers as part of our basic plumbing work and as part of full bathroom refits. This page explains each step so you know what to expect and what to ask.

Step one: matching the shower to your water system

Combi boilers and unvented cylinders supply mains-pressure hot water, which suits thermostatic mixer showers. Gravity systems with a loft tank give lower pressure, so a pumped shower or a power shower may be needed. Electric showers heat cold mains water themselves and work with any system, but need their own electrical supply from a qualified electrician.

Our shower types guide compares these in more detail, and our low water pressure guide explains what to do if pressure is weak.

Step two: planning the position

The shower needs a route for hot and cold supplies and a waste pipe with enough fall to reach the soil stack or drain. Over a bath this is usually simple. In a new corner or alcove it can mean lifting floorboards or boxing in pipes.

Concealed valves, where only the control shows on the wall, need the pipework chased into or built behind the wall before tiling. Exposed bar valves are simpler to fit to an existing wall.

Step three: making the walls watertight

Walls around a shower take far more water than anywhere else in the house. Plasterboard should be replaced or protected with a suitable backer board, and the shower area waterproofed before tiling.

Tiles and grout alone are not waterproof. Skipping this step is the most common reason a shower leaks through to the ceiling below. Our tanking guide explains how it is done.

Step four: tray, valve, screen and finishing

The tray is fitted level on a solid base and connected to the waste. The valve and riser or head go in, the walls are tiled and grouted, then the screen or door is fitted and every joint is sealed with silicone.

Before handover the shower is run and checked for leaks at the valve, waste and screen seals, and you are shown how to use and clean it.

Replacing an existing shower

If you already have a shower and want a new one in the same place, the job is often simpler, but it is still worth checking the tray, seals and wall behind. A new shower on an old, leaking tray will not stay dry for long. Our shower replacement guide covers when a like-for-like swap is enough.

Common mistakes that shorten a shower's life

A tray bedded on a few blobs of adhesive instead of a full, solid base, which lets it flex and break the seal. A waste pipe with too little fall, which drains slowly and smells. Silicone applied over dirty or wet surfaces. Screens fixed into grout lines rather than tile. Each is easy to avoid at installation and expensive to fix once the walls are finished.

Questions we get asked most

Can any shower work with my boiler?

Not every type. Combi boilers suit mixer showers, gravity systems may need a pump, and electric showers work with any system. We check what you have before recommending one.

Can a shower be added over my bath?

Usually, yes. The wall around the bath needs waterproofing and tiling to a suitable height, and a bath screen stops water reaching the floor.

Do I need an electrician for a shower?

For an electric shower or pump, yes. The electrical supply must be installed by a qualified electrician to the rules for bathrooms.

Do you fit shower trays and doors on their own?

Yes. Fitting shower trays and shower doors is part of the plumbing work we do, as well as full shower installations.

How do I book a shower installation?

Send us an enquiry with a photo of the space and your boiler or cylinder. We will arrange a visit and a free quote.

CallWhatsAppFree Quote