First fix and second fix: the two stages of bathroom plumbing

Quotes and schedules for a new bathroom often mention first fix and second fix. They are trade terms for the two visits the plumbing needs: one before the walls and floor are finished, and one after. Understanding the split explains why the plumber seems to disappear for a few days in the middle of the job.

This guide explains what each stage covers, why pressure testing sits between them, and how the stages fit around tiling and electrics.

First fix: everything that will be hidden

First fix happens once the room has been stripped out and before any boarding or tiling. Supply pipes are run to where each tap, valve and cistern will sit, and waste pipes are run to the soil stack or drain. Concealed shower valves and cisterns are fixed in place at this stage, because they will be behind the finished wall.

If the layout is changing, this is when the toilet or shower drain moves. Our published figure for moving a toilet or shower drain is £400-£900 in labour and materials, because floor and wall access is needed.

Testing before it disappears

Before any pipe is covered, the new pipework is pressure tested and checked for leaks. It is far cheaper to find a weeping joint now than after the tiles are on. Only once the test passes do the walls get boarded and tanked where needed.

Between the two fixes

With the pipework proven, the room is boarded, waterproofed around wet areas and tiled. Electrical first fix for lighting, the extractor and any underfloor heating runs alongside the plumbing first fix, so cables and pipes are both in before the walls close.

Second fix: everything you see and use

Second fix connects the finished items. The toilet, basin, bath and shower controls go on, taps are fitted, wastes are connected and sealed, and everything is run and checked. Sealant goes on last, once all the fittings are in position.

Where each stage sits in a typical bathroom job
StagePlumbing workOther trades at the same time
Strip-outIsolate and cap suppliesOld tiles and suite removed
First fixRun supplies and wastes, fix concealed valves and cisternsElectrical first fix
TestPressure test new pipeworkNone, walls stay open
Boarding and tilingNo plumbing on siteBoarding, tanking, tiling
Second fixFit suite, taps, controls, wastesElectrical second fix, sealant

Why one team makes the gap shorter

When plumbing, electrics and tiling are separate firms, each stage waits for the next trade to be free. With our own team handling all three, with no subcontractors, second fix follows the tiling without a gap in the diary. Most of our full refurbishments run 7-12 working days depending on scope.

What this means for you during the job

First fix means the old suite is out and the room is not usable, so if this is your only bathroom, we talk through the timing on the survey so you know which days the toilet and basin will be out of use and can plan around them.

Decisions on concealed valves, cistern positions and tap heights need to be made before first fix, because they are fixed behind the wall once tiling starts. Having your products chosen early keeps the job moving and avoids reopening finished walls.

Questions we get asked most

What is first fix plumbing?

The hidden pipework: supplies and wastes run to each position, and concealed valves and cisterns fixed, before the walls and floor are finished.

What is second fix plumbing?

Fitting and connecting the visible items, such as the toilet, basin, taps and shower controls, after tiling is complete.

Why is there a gap between the two?

The walls and floor have to be boarded, waterproofed and tiled between them. With one team doing all of it, that gap is kept short.

Is the pipework tested?

Yes. New pipework is pressure tested after first fix and before anything is covered.